Handover is the last impression a client has of your firm. This free Excel checklist takes your team through what to finish before the appointment, what to test in every room, and the documents, keys and signatures to collect on the day.
One Handover checklist sheet and a How to use sheet. Each item is marked Yes, No or Not applicable from a drop-down list, with remarks and a photo reference, and any item marked No is highlighted.
| Section | What it checks |
|---|---|
| 1. Before the handover appointment | VOs signed and billed, final claim, defects closed, permits, cleaning, common area protection, utilities |
| 2. Room by room | Doors, windows, carpentry, tiles, paint, ceilings, power points, lights, taps and drainage, toilets, sealant, air conditioners |
| 3. Documents handed over | Warranties, manuals, final invoice and statement, defects liability period, certificates, defects contact |
| 4. Keys and access | Keys, access cards, remotes, digital lock codes |
| Items still open | Anything left, with the agreed fix date |
Use it with our defects list template: close the defects first, then hand over.
Five steps. Most of the work happens before the appointment.
Work through the first section a few days before handover. Chase unsigned VOs and close open defects first.
Test as you go, and mark each item Yes, No or Not applicable.
Write anything unfinished in the last section with the date you agreed to fix it, so the handover can still go ahead.
Go through the warranties, manuals, final invoice and keys with the client, and note how many keys you handed over.
Both sides sign. Keep the checklist with the job file as the record of what was handed over and when.
An Excel checklist in four sections, with a list for items still open and a signature block. Fill in the form and the download appears straight away.
An Excel file you can fill in straight away. It also opens in Google Sheets and Numbers.
Download the renovation handover checklistMore free templates
Handover packs are slow to put together because the pieces are scattered: signed VOs in one place, warranties in emails, photos in chats. Lynqra builds systems that file these against the job as the project runs, so most of the pack is ready before the appointment. A person in your firm still checks it and signs off with the client.
See project admin and site update automation, or everything we automate for ID and renovation firms.
Twice: a few days before handover to prepare, and on the day with the client.
List it in the items still open section with an agreed date. Both sides sign, so it is clear what is outstanding.
Yes. A signed and dated checklist records when the unit was handed over and what was outstanding, which matters for the defects liability period in your contract.
Yes. Fill in the short form and the download appears straight away. You can use and change the file for your own firm's jobs.
Yes. Upload the file to Google Drive and open it with Google Sheets, or open it in Numbers. The formulas and drop-down lists work in both.
Related guides for ID and renovation firms
Bring the quotation, VO, claim or update that takes your team the longest. There is no commitment, and a person in your firm stays on prices, payments and customer commitments.
Book a free consult